亚洲av久无精品一区二区国产,99久久久久久久久久久久久久久,亚洲国产日韩不卡综合,亚洲精品综合色区二区

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發(fā)布和相關資訊,敬請關注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.betterproxy.cn/

地址:山東省濟南市章丘圣井工業(yè)園

在搭設木工加工棚時要了解到施工要點

來源:http://www.betterproxy.cn/   發(fā)布時間:2022-12-19

由于木工加工棚的施工質量會對后期使用的產生較大影響,因此,在搭設木工加工棚的過程中應注意以下施工要點。
Since the construction quality of woodworking shed will have a great impact on the safety of later use, the following construction points should be paid attention to during the erection of woodworking shed.
(1)施工前,應先編制詳細的木工加工棚施工方案,并在開始施工時先對木工加工棚范圍內的兩側道路進行整平、拓寬作業(yè),設置排水溝,以確保排水暢通,適應吊車站位及吊裝。
(1) Before construction, a detailed construction plan for the woodworking shed shall be prepared. At the beginning of construction, the roads on both sides of the woodworking shed shall be leveled and widened, and drainage ditches shall be set to ensure smooth drainage and adapt to the crane station and hoisting.
(2)若木工加工棚的基礎施工范圍內光纜、電力線眾多,還應制訂光纜、電力線等設備的改移方案,以及相關保護措施,以確保施工和設備。
(2) If there are many optical cables and power lines within the foundation construction scope of the woodworking processing shed, the relocation scheme of optical cables, power lines and other equipment, as well as relevant protective measures, should also be formulated to ensure construction safety and equipment safety.
(3)木工加工棚施工時,其焊接作業(yè)的過程一定要注意防火,如果有風必須設置好擋風板,以免發(fā)生火花飛濺,造成隱患。同時,木工加工棚上不得堆放雜物,以及鋼筋、模板等材料,以防發(fā)生火災。
(3) During the construction of the woodworking shed, attention must be paid to fire prevention during the welding operation. If there is wind, the wind deflector must be set up to prevent sparks from splashing and causing potential safety hazards. At the same time, no sundries, reinforcement, formwork and other materials shall be stacked on the woodworking shed to prevent fire.
木工加工棚
(4)按木工加工棚的矩型管立桿間距、排距要求進行定位放線,并將墊板鋪設放平穩(wěn),不得懸空。同時,矩型管立桿接長應采用對接電焊連接,立桿對接電焊焊接應交錯布置。
(4) The positioning and setting out shall be carried out according to the requirements for the spacing and row spacing of rectangular pipe poles in the woodworking shed, and the base plate shall be laid stably and shall not be suspended. At the same time, the extension of rectangular pipe upright shall be connected by butt welding, and the butt welding of upright shall be staggered.
(5)木工加工棚棚頂鋪裝施工時,均應在既有線上方作業(yè),且須注意高空作業(yè),嚴禁任何機具和材料意外掉落損壞線路設備。同時,應通過鋼管立柱,在木工加工棚兩側設置接地措施。
(5) When paving the roof of the woodworking shed, work above the existing line, and pay attention to the safety of working at heights. It is strictly forbidden to accidentally drop any machines and materials to damage the line equipment. Meanwhile, grounding measures shall be set on both sides of woodworking shed through steel pipe column.
此外,木工加工棚在搭設完成后,施工單位應先組織領導小組組長及員、質檢員等進行驗收,自檢合格后報請監(jiān)理單位進行驗收,驗收合格后方可進行使用。更多相關內容就來我們網(wǎng)站http://www.betterproxy.cn咨詢吧!
In addition, after the woodworking shed is erected, the construction unit shall first organize the leader of the safety leading group, the safety officer, the quality inspector, etc. to carry out acceptance. After the self inspection is qualified, the woodworking shed shall be submitted to the supervision unit for acceptance. The woodworking shed can only be used after the acceptance is qualified. More relevant content will come to our website http://www.betterproxy.cn Consult!

普兰店市| 天门市| 平阳县| 宣恩县| 那坡县| 永平县| 遵义市| 黑龙江省| 都匀市| 华阴市| 乡宁县| 饶平县| 贡山| 永兴县| 宜都市| 常山县| 多伦县| 河曲县| 红安县| 沂源县| 积石山| 垫江县| 苏州市| 铜川市| 察雅县| 肇州县| 濮阳市| 临安市| 抚州市| 南部县| 云浮市| 宜君县| 龙门县| 宁夏| 威信县| 梅州市| 扶沟县| 巴彦县| 蒙城县| 沙雅县| 卢湾区|